Progettisti e affini

Bridge restoration

Bridge restoration

The project has as its object the structural consolidation of the Bridge over the Chiese river in Pontenove, in the municipality of Bedizzole. The structure of the bridge showed some signs of structural instability, especially concerning the brick vaults.
A series of tests were then carried out on the materials to arrive at the actual consolidation project.

  • Località: Bedizzole (BS)
  • Committente: Municipality of Bedizzole
  • Settore: Public
  • Servizi:
  • Project summary: 4 arches
    60 m in length
    7 m high