Interventions on IKEA warehouse
Interventions on IKEA warehouse
The project includes a series of interventions on IKEA depots in Piacenza called DC1 and DC2. The interventions concern the construction of new metal staircases, for access to cover both buildings, necessary for the maintenance of the photovoltaic system, the rebuilding of the roof covering and the construction of new loading bays for the DC1.
We also developed the project in order to achieve the seismic improvement of the building DC1.
- Località: Loc. Le Mose (PC)
- Committente: IKEA ITALIA
- Settore: Business-Industry
- Servizi:
- Project summary:
100,000 m2 of roof
20,000 anchors for the seismic reinforcement
8 new loading bays
Info
New staircase serving the roof
Structure detail
Info
Seismic improvement intervention
Structural surveys
Info
Replacement of the covering sheath
State of fact
Info
Replacement of the covering sheath
State of fact
Info
Construction of new loading bays
State of fact